34369597
general maintenance work of fire and safety equipments at wrpl sanganer station carrying out maintenance and inspection of fire extinguishers / fire fighting equipment, as per oisd 142, including pastings / marking of maintenance date and charges for labour, including oiling, greasing , testing as per direction of eic inclsive of all tools & tackles, consumable, transportation labour charges etc and measuring instruments for the same as directed by the eic / site engineer and submitting the reports of the inspection as per hse manual format. 2 for 75 kg. capacitydcp extinguisher on monthly basis 3 for 9kg. capacity pressurized type dcp extinguisher on monthly basis. the charges including gas recharge of dcp extiguishers. 4 for 2 to 4.5kg. capacitydcp / co2 extinguisher on monthly basis. 5 for 6.8 kg. capacitydcp / co2 extinguisher on monthly basis. 6 maintenance and inspection of monitors and hydrants as per direction of eic. reporting to be done as per hse manual format including oiling, greasing , testing, replacement of owner suppliedhydrant washers as per direction of eic inclsive of all tools & tackles, consumable, transportation labour charges etc ( rate per monitor / hydrants ) on monthly basis. 7 maintenance related to foam flooding sysyem 8 dechocking of foam sprinkler nozzles ( air spraying type nozzels ) provided in main line engine shed by removing the nozzles, flushing the system, refitting the nozzles & cleaning the y strainer near deluge valve complete in all respect inclusive of tools tackles, labours , consumables like teflon tape etc. ( rate per engine shed ) .as per direction of eic. 9 supply & changing of level pipes of pvc in foam tank, diesel tank, radiator water level pipe, level pipe of foam tender etc. inclsive of all tools &tackles, consumable, transportation etc. as per direction of eic. 10 painting of foam bladder tank of 3 kl capacity & associated piping near tank with one coat of redoxide primer & two coats of fire red synthetic enamel paint, writting letters on the tank, piping etc. complete in all respect as per direction of eic. on hlf yrly basis. 11 painting of 2kg co2 extinguisher with one coat of red oxide primer & two coats of fire red synthetic enamel paint ( asian paint / berger / nerolac ) . before painting old stickers to be removed & surface preparation to be done by contractor. new water proof type inspection sticker will be supplied by contractor. on half yrly basis. as per direction of eic. 12 painting of 4.5 / 6.8 kg co2, 9 / 10 kg dcp extinguisher, with one coat of red oxide primer & two coats of fire red synthetic enamel paint ( asian paint / berger / nerolac ) .before painting old stickers to be removed & surface preparation to be done by contractor. new water proof type inspection sticker will be supplied by contractor as per eic. on hlf yrly basis. as per direction of eic. 13 maintenance related to detectors and manual calling points ( mcps ) . as per direction of eic. 14 supply and fitting of circular glass suitable for mcp ( dia.7 cm, 2 mm thickness ) . as per direction of eic. 15 maintenance related to co2 , dcp extinguishers 16 supply & fitting of clamps for hanging 2kg / 3.2kg & 4.5kg co2 extinguisher on wall including labour charges, tools tackles &consumables complete in all respect as per direction of eic. 17 hydrostatic testing, inspection of safety valve, and refilling of high pressure cylinder through cce approved party and charging upto required pressure including delivery of the cylinder from the station and returning the same inclusive of all labour material, transportation and all the other incidental expenses along with hydrotesting certificate.the cylinder is tobe returned back to the station within 15 days from the date of receiving from the station. 18 for 2kg co2 cyl. 19 for 4.5 kg co2 cyl. 20 for 6.8 kg co2 cyl. 21 for 22.5kg co2 cyl. omd 22 for 68 kg co2 cyl. 23 for 18kg n2 cyl. of foam flooding / co2 system 24 refilling of breathing apparatus set cylinder with dry compressed air upto a pressure of 200 / 300 bar, 6 liter capacity as per direction of eic, inclusive of transportation, handling charges, hydrotesting from cce approved party complete in all respect and along with submission ofhydrotesting certificate. 25 refilling of co2 gas in cartidges for using in dcp extinguishers including all labour, transportation etc. complete as per specification and direction of eic / site engineer. ( co2 cartridge of 120 / 200gms ) 26 hydrotesting of dcp type fire extinguishers of various capacities at an internal pressure of 30 kgf / cm2 as per is 2171 and oisd std 142. painting of the cylinders with one coat of red oxide primer and two coats of synthetic enamel ( asian paint / berger / nerolac ) paint of desired shade ( including trolley ) . as directed by eic. 27 75 kg capacity dcp extinguisher 28 9kg / 10 kg capacity dcp extinguisher 29 replacement of defective parts by supply and fitting of items as per is standard for 9kg / 10kg dcp extinguisher as per direction of eic. 30 discharge hose with squeeze grip hose which can withstand pressure upto 50kgf / cm2. 31 dcp extinguisher cap washer 32 complete cap assembly of 9kg / 10kg dcp extinguisher with brass made assembly as per is 2171:1999. the cap assembly to be supplied & installed including all tools & tackles. hydrotesting of dcp extinguisher to be done after replacement of cap assembly. as per direction of eic. 33 replacement of defective parts by supply and fitting of items for 50 / 75 kg dcp extinguisher. as per direction of eic. 34 discharge hose with clamps ( 6.5mtr length ) . hose should withstand a pressure upto 50kgf / cm2. 35 brass connection tube between co2 cylinder & dcp cylinder with leather washer. 36 cap washer 37 trolley wheel set with required fittings. 38 replacement of defective parts by supply and fitting of items for co2 extiguishers. as per direction of eic. 39 hdpe discharge horn for 2kg / 3.2kg co2 extinguisher along with bend pipe fitting, complete in all respect as per direction of eic. 40 hdpe discarge horn for 6.8kg capacity co2 extinguishers with fittings, as per direction of eic. 41 high pressure discharge hose for 6.8kg co2 extinguisher with fittings, as per direction of eic. 42 trolley wheel set for 6.8kg co2 extinguisher along with handle complete with fittings as per direction of eic. 43 handle for 2kg / 3.2kg / 4.5kg extinguisher 44 safety pin with nylon string for co2 extinguisher 45 supply & fitting plastic safety pin holder in co2 extinguisher. 46 maintenance related to fire water line and hydrant outlet, as per direction of eic 47 supply and fitting of blank cap ( as per is 5290 , red colour with gi chain ) suitable for 63 mm hydrant outlet as per direction of eic 48 supply & fitting fire neoprene made hydrant disc washer as per direction of eic. as per is type a of is 937 : 1981 49 fire hydrant / fire hose coupling washer for landing valve double head outlet ( type b ) as per is type a of is 937 : 1981 ( neoprene make ) for 3 valve 50 maintenance of co2 flooding system 51 supply & installation of high strength discharge hoses of co2 flooding system cylinders. as per direction of eic. 52 other works 53 painting of sand bucket with one coat of redoxide primer and two coat of synthetic enamel paints ( fire red from outside and white from inside ) , writing letter on sand bucket ( by stencils ) including writing of sand bucket in english and hindi by black paint completed in all respect including labour charges, material, removing of old sand, filling back the sand after painting etc as per direction of eic 54 painting of stand post of sand bucket with one coat of redoxide primer and two coat of synthetic enamel paints ( fire red ) including writing of aag in english and hindi by black paint complete in all respect including labour charges, material, removing of old sand filling back the sand after painting etc as per direction of eic 55 supply & fitting of rubber beeding of the complete one hose box ( both doors ) as per direction of eic including removing of worn out rubber beeding, labour charges, tools & tackles etc. complete in all respect. ( 2 mtr. ) good quality rubber as per direction of site engineer or eic 56 supply & fitting of glass ( 18x10 ) of hose box inclusive of rubber beeding ( 1 mtr. ) wherever required complete in all respect inclusive of material, labour , consumables etc. ( rate for both glasses & rubber beeding ) good quality rubber as per direction of site engineer or eic 57 cleaning & shifting of portable fire fighting equipment e.g. extinguishers, foam trolely, sand buckets, foam monitors, hydrants, foam jerrycans, stands, hose boxes etc making it stain free. as per direction of site engineer or eic 58 erection of stand post of wind sock in place damaged stand post as per specification approved by eic including tools and tackles, welding, grouting, material supplied, labour charges etc complete in all respect. ( 1 mtr. height, made up of ms angles 30mmx30mmx5mm ) 59 supply & installation of good quality nylone make wind socks as per direction of eic. the replacement to be done on quarterly basis. 60 pressure testing of b type hoses as per ims manual including all tools, tackles and labour.report to be submitted as per ims manual or format provided by eic. arrangement for pressure testing to be supplied by the bidder. work to be done on half yearly basis. 61 testing of afff as per bis: 4989 from reputed institute like gujarat industrial research & development agency, vadodara or fire test & research laboratory, haryana. 62 painting of zebra marking for extinguisher identification along with the letter writing in 3m radium sticker 63 supply and installation of 1.25 inch ball valve of monitors 64 daily / weekly checking and reporting ( as per approved format ) of following fire fighting system.1. daily check of systems.2. healthiness of fire water line and landing valve3. monitoring and reporting of fire detection & fire fighting systems installed in plant and all other formats provided by eic as per direction ( rate for each month ) 65 ppe maintenance / upkeep on monthly basis like helmets, breathing apparatus, water jel blanket, resucitator set, fire proximity suite, ear plugs, fire proximity suite, gogles, first aid box maintenance, belts in control rooms and other rooms as per the instrction of eic 66 extiguisher monthly maintenance at rcp locations ( kukas & jawanpura ) . carrying out maintenance and inspection of fire extinguishers as per bis including pastings / markingof maintenance date , including refilling of dcp powder, and charges for labour, including oiling, greasing, testing, as per the direction of eic inclusive of all tools & tackles, consumable, transportation, labour charges, etc and measuring instruments for the same as directed by eic / site engineer and submitting the reports of inspection as per hse manual format. 67 providing extra manpower assistance for f&s related cleaning / rectification works during various audits by sta, msihc, oisd, pngrb, rcp committees as per direction of eic...
Due Date : October 28, 2022
Tender Value : ₹ Ref. Documents